CONTRACT No.DC/2001/09 SAN TIN EASTERN MAIN DRAINAGE CHANNEL

WEEKLY ENVIRONMENTAL SITE INSPECTION REPORT – No. STEMDC2003/01

Date of Inspection:

18/01/2003

Current Weather:

Sunny + Dry

Time of Inspection:

11:00

Weather Previous 24 Hrs.:

Sunny + Dry

1. Works in Progress:

 

1.1   General site clearance.

1.2   Removal of river bed material.

2. Air Quality:

 

 

2.1 Fugitive dust generated by site traffic noted.

 

Recommendations:

-          The haul road shall be sprayed with water.

-          The load on the vehicle shall be covered entirely by clean impervious sheeting.

-          Manual wheel washing facilities shall be provided at all exits in the period of construction of wheel wash bay.

3. Noise:

 

 

3.1 No significant construction noise noted.

 

Recommendations:

-          None at present.

4. Waste Management:

 

 

4.1 The accumulation of general site clearance waste noted.

4.2 No chemical waste storage area observed.

 

Recommendations:

-          Remove the waste in a regular basis. 

-          Design and construct a chemical waste storage area according to the COP issued by EPD.   

5. Water Quality:

 

 

5.1 Stagnant water noted near site office.

 

Recommendations:

-          Removal of stagnant water as soon as practicable.

6. Status and Performance of Mitigation Measures:

 

6.1 Wheel wash facilities provided at one of the exit.

 

 

Inspection carried out by:            ___________________               Dated: 18/01/03    

Dennis Tsui                                             

                        Environmental Scientist

 

 

 

 

 

 

 

 

 

CONTRACT No.DC/2001/09 SAN TIN EASTERN MAIN DRAINAGE CHANNEL

WEEKLY ENVIRONMENTAL SITE INSPECTION REPORT – No. STEMDC2003/02

Date of Inspection:

25/01/2003

Current Weather:

Cloudy + Dry

Time of Inspection:

11:00

Weather Previous 24 Hrs.:

Sunny + Dry

1. Works in Progress:

 

1.3   General site clearance.

1.4   Removal of river bed material.

1.5   Construction of wheel wash bay.

2. Air Quality:

 

 

2.1 Fugitive dust generated by site traffic noted.

2.2 Stockpiles noted.

 

Recommendations:

-          The haul road shall be sprayed with water.

-          Manual wheel washing facilities shall be provided at all exits in the period of construction of wheel wash bay.

-          The stockpiles shall be covered if they will not be removed in a short period.

3. Noise:

 

 

3.1 No significant construction noise noted.

 

Recommendations:

-          None at present.

4. Waste Management:

 

 

4.1 The accumulation of general site clearance waste noted.

4.2 No chemical waste storage area observed.

 

Recommendations:

-          Remove the waste in a regular basis. 

-          Design and construct a chemical waste storage area according to the COP issued by EPD.

-          The stockpiles of contaminated material must be covered at all times. 

5. Water Quality:

 

 

5.1 Stagnant water noted near site office.

 

Recommendations:

-          Removal of stagnant water as soon as practicable.

6. Status and Performance of Mitigation Measures:

 

6.1 Wheel wash facilities provided at one of the exit.

 

 

Inspection carried out by:            ___________________               Dated: 25/01/03    

Dennis Tsui                                             

                        Environmental Scientist

 

 

 

 

 

 

 

CONTRACT No.DC/2001/09 SAN TIN EASTERN MAIN DRAINAGE CHANNEL

WEEKLY ENVIRONMENTAL SITE INSPECTION REPORT – No. STEMDC2003/03

Date of Inspection:

30/01/2003

Current Weather:

Sunny + Haze

Time of Inspection:

13:30

Weather Previous 24 Hrs.:

Sunny + Haze

1. Works in Progress:

 

1.6   General site clearance.

1.7   Removal of river bed material.

2. Air Quality:

 

 

2.1 Stockpiles noted.

 

Recommendations:

-          Manual wheel washing facilities shall be provided at all exits in the period of construction of wheel wash bay.

-          The stockpiles shall be covered if they will not be removed in a short period.

3. Noise:

 

 

3.1 No significant construction noise noted.

 

Recommendations:

-          None at present.

4. Waste Management:

 

 

4.1 No chemical waste storage area observed.

 

Recommendations:

-          Remove the waste in a regular basis. 

-          Design and construct a chemical waste storage area according to the COP issued by EPD.

-          The stockpiles of contaminated material must be covered at all times. 

5. Water Quality:

 

 

5.1 Stagnant water noted near site office.

 

Recommendations:

-          Removal of stagnant water as soon as practicable.

-          Replace the wastewater in the wheel wash bay from time to time.

6. Status and Performance of Mitigation Measures:

 

6.1 Wheel wash facilities provided at one of the exit.

6.2 Some of the slopes have been covered.

6.3 The stockpile of contaminated mud has been covered.

 

 

Inspection carried out by:            ___________________               Dated: 30/01/03    

Dennis Tsui                                             

                        Environmental Scientist