CONTRACT No.DC/2001/09 SAN TIN EASTERN MAIN DRAINAGE CHANNELWEEKLY ENVIRONMENTAL SITE INSPECTION REPORT – No. STEMDC2003/01 |
||||||
Date of Inspection: |
18/01/2003 |
Current Weather: |
Sunny + Dry |
|||
Time of Inspection: |
11:00 |
Weather Previous 24 Hrs.: |
Sunny + Dry |
|||
1. Works in Progress: |
|
|||||
1.1 General site clearance. 1.2 Removal of river bed material. |
||||||
2. Air Quality: |
|
|||||
2.1 Fugitive dust generated by site traffic noted.
Recommendations: - The haul road shall be sprayed with water. - The load on the vehicle shall be covered entirely by clean impervious sheeting. - Manual wheel washing facilities shall be provided at all exits in the period of construction of wheel wash bay. |
||||||
3. Noise: |
|
|||||
3.1 No significant construction noise noted.
Recommendations: - None at present. |
||||||
4. Waste Management: |
|
|||||
4.1 The accumulation of general site clearance waste noted. 4.2 No chemical waste storage area observed.
Recommendations: - Remove the waste in a regular basis. - Design and construct a chemical waste storage area according to the COP issued by EPD. |
||||||
5. Water Quality: |
|
|||||
5.1 Stagnant water noted near site office.
Recommendations: - Removal of stagnant water as soon as practicable. |
||||||
6. Status and Performance of Mitigation Measures: |
|
|||||
6.1 Wheel wash facilities provided at one of the exit.
|
||||||
Inspection carried out by: ___________________ Dated: 18/01/03
Dennis Tsui
Environmental Scientist
CONTRACT No.DC/2001/09 SAN TIN EASTERN MAIN DRAINAGE CHANNELWEEKLY ENVIRONMENTAL SITE INSPECTION REPORT – No. STEMDC2003/02 |
||||||
Date of Inspection: |
25/01/2003 |
Current Weather: |
Cloudy + Dry |
|||
Time of Inspection: |
11:00 |
Weather Previous 24 Hrs.: |
Sunny + Dry |
|||
1. Works in Progress: |
|
|||||
1.3 General site clearance. 1.4 Removal of river bed material. 1.5 Construction of wheel wash bay. |
||||||
2. Air Quality: |
|
|||||
2.1 Fugitive dust generated by site traffic noted. 2.2 Stockpiles noted.
Recommendations: - The haul road shall be sprayed with water. - Manual wheel washing facilities shall be provided at all exits in the period of construction of wheel wash bay. - The stockpiles shall be covered if they will not be removed in a short period. |
||||||
3. Noise: |
|
|||||
3.1 No significant construction noise noted.
Recommendations: - None at present. |
||||||
4. Waste Management: |
|
|||||
4.1 The accumulation of general site clearance waste noted. 4.2 No chemical waste storage area observed.
Recommendations: - Remove the waste in a regular basis. - Design and construct a chemical waste storage area according to the COP issued by EPD. - The stockpiles of contaminated material must be covered at all times. |
||||||
5. Water Quality: |
|
|||||
5.1 Stagnant water noted near site office.
Recommendations: - Removal of stagnant water as soon as practicable. |
||||||
6. Status and Performance of Mitigation Measures: |
|
|||||
6.1 Wheel wash facilities provided at one of the exit.
|
||||||
Inspection carried out by: ___________________ Dated: 25/01/03
Dennis Tsui
Environmental Scientist
CONTRACT No.DC/2001/09 SAN TIN EASTERN MAIN DRAINAGE CHANNELWEEKLY ENVIRONMENTAL SITE INSPECTION REPORT – No. STEMDC2003/03 |
||||||
Date of Inspection: |
30/01/2003 |
Current Weather: |
Sunny + Haze |
|||
Time of Inspection: |
13:30 |
Weather Previous 24 Hrs.: |
Sunny + Haze |
|||
1. Works in Progress: |
|
|||||
1.6 General site clearance. 1.7 Removal of river bed material. |
||||||
2. Air Quality: |
|
|||||
2.1 Stockpiles noted.
Recommendations: - Manual wheel washing facilities shall be provided at all exits in the period of construction of wheel wash bay. - The stockpiles shall be covered if they will not be removed in a short period. |
||||||
3. Noise: |
|
|||||
3.1 No significant construction noise noted.
Recommendations: - None at present. |
||||||
4. Waste Management: |
|
|||||
4.1 No chemical waste storage area observed.
Recommendations: - Remove the waste in a regular basis. - Design and construct a chemical waste storage area according to the COP issued by EPD. - The stockpiles of contaminated material must be covered at all times. |
||||||
5. Water Quality: |
|
|||||
5.1 Stagnant water noted near site office.
Recommendations: - Removal of stagnant water as soon as practicable. - Replace the wastewater in the wheel wash bay from time to time. |
||||||
6. Status and Performance of Mitigation Measures: |
|
|||||
6.1 Wheel wash facilities provided at one of the exit. 6.2 Some of the slopes have been covered. 6.3 The stockpile of contaminated mud has been covered.
|
||||||
Inspection carried out by: ___________________ Dated: 30/01/03
Dennis Tsui
Environmental Scientist